DNV規格 DNV-ST-N002, 2016: Site Specific Assessment of Mobile Offshore Units for Marine Warranty

DNV規格 DNV-ST-N002, 2016【見積商品】

産業規格・仕様書  >  DNV  > 




DNV規格 DNV-ST-N002, 2016【見積商品】

0(税込)

数量

書名

DNV-ST-N002, 2016: Site Specific Assessment of Mobile Offshore Units for Marine Warranty
(Includes all amendments and changes through Amendment , November 2021)
DNV規格 ST-N002, 2016: 移動式オフショアユニットの海洋保証の為のサイト条件アセスメント
発行元 DNV
発行年/月 2021年11月
装丁 ペーパー
ページ数 56 ページ
発送予定 御見積時にお知らせします
【最新版の入手の可否についての確認が必要な商品となります】
 
※当ウェブ・ショップに掲載のない規格につきましては、別途お問合せ下さいませ。
※掲載の規格は、当ウェブ・ショップに掲載時点で確認できた最新版でございます。
最新の発行状況につきましては受注時に改めて確認をさせて頂きますので予めご了承下さい。

 

Description

This standard addresses the site specific assessment of MOUs. Such assessments can be used as the basis for the Marine Warranty Survey approval of the unit at the assessed location.

The integrity of the unit in the installed condition is the responsibility of the Assured, and is subject to compliance with the assumptions and recommendations made in the site specific assessment and, where subject to Marine Warranty Survey, the recommendations given in the location approval.

The marine operations that can occur during the development of an offshore asset or when objects, including MOU’s are moved by water from one place to another are covered in DNV-ST-N001, /9/, which covers most offshore assets and operations that are likely to require MWS approval.

Details of documents that are generally required as part of the approval process are included.

Guidance note:
The operation and document type dictates the level of review by the MWS company. The following terms have been used as an indication of the level of detail:
- Documented - An in-depth document that is subjected to a detailed review by the MWS company e.g. analysis reports, procedures and operation manuals
- Submitted - A document that is provided to the MWS company in advance where the checking is limited e.g. a certificate to confirm that piece of equipment has the required capacity. In some cases this could be immediately prior to the operation but this may lead to delays if the documents are incorrect and/or insufficient.